Banner graphic including a montage of Washington State Park scenes and the agency logo

Belfair, Twanoh and Potlatch state parks

map showing Belfair, Twanoh and Potlatch state parks positioned at southern end of Hood Canal

Washington State Parks has begun a land-use planning project for Belfair, Twanoh and Potlatch state parks in the lower Hood Canal area. As planning progresses, check back for updated project information.

The planning project, also known as Classification and Management Planning (CAMP), includes the four planning stages described below. The CAMP will address overall visitor experiences, natural and cultural resources, use of the park’s buildings, recreation areas, and trails, and other topics of interest to the community and park visitors.

The entire planning process includes public workshops and meetings over an approximate year-long period. There are opportunities for the public to comment at each of the stages and documents will be added below when they are available.

Stage One – Identify issues and concerns

The purpose of this stage is to understand what is important to the park community, what to change or save in the state park. This helps get a sense of the range and type of issues that need to be considered through the planning process.

FileDateSize
Stage 1 - Belfair public comments.pdf09/01/2009  23 kb
Stage 1 - Lake Isabella public comments.pdf09/01/2009  32 kb
Stage 1 - Potlatch public comments.pdf09/01/2009  16 kb
Stage 1 - Public comment e-mails.pdf09/01/2009  13 kb
Stage 1 - Twanoh public comments.pdf09/01/2009  16 kb

Stage Two – Exploring alternative approaches

At this stage, the planning team suggests potential alternative approaches to address the various issues and concerns raised by people in stage one. No preferred alternative is established; rather this is an opportunity to understand the range of possibilities.

FileDateSize
Stage 2 - 01 Alternatives Report Belfair.doc09/01/2009  146 kb
Stage 2 - 02 Appendix A Belfair.pdf09/01/2009  277 kb
Stage 2 - 03 Appendix B Belfair.pdf09/01/2009  382 kb
Stage 2 - 04 Alternatives Report Twanoh.doc09/01/2009  215 kb
Stage 2 - 05 Appendix A Twanoh.pdf09/01/2009  256 kb
Stage 2 - 06 Appendix B Twanoh.pdf09/01/2009  241 kb
Stage 2 - 07 Alternatives Report Lk.Isabella.Potlatch.Lilliwap.doc09/01/2009  263 kb
Stage 2 - 08 Appendix A LakeIsabella.pdf09/01/2009  270 kb
Stage 2 - 09 Appendix B LakeIsabella.pdf09/01/2009  266 kb
Stage 2 - 10 Appendix C LakeIsabella.pdf09/01/2009  269 kb
Stage 2 - 11 Appendix A Potlatch.pdf09/01/2009  271 kb
Stage 2 - 12 Appendix B Potlatch.pdf09/01/2009  130 kb
Stage 2 - 13 Appendix A Lilliwap.pdf09/01/2009  124 kb
Stage 2 - public comments (Sept 26 workshop).pdf09/01/2009  31 kb

Stage Three – Preparing preliminary recommendations

The best ideas from the alternative approaches developed in stage two are combined into a preliminary plan in this stage. The plan includes recommendations for use and development of land, changes to property boundaries and ways to address issues raised during the planning process. Another important document completed at this stage is the SEPA checklist that describes environmental impacts of the recommendations (available for public review upon request).

FileDateSize
Stage 3 - 01 Lower Hood Canal DNS.pdf09/01/2009  260 kb
Stage 3 - 02 Lower Hood Canal SEPA Checklist.pdf09/01/2009  362 kb
Stage 3 - 03 Lower Hood Canal SEPA Checklist Appendix A - Belfair-Twanoh-Potlatch.pdf09/01/2009  593 kb
Stage 3 - 03A Lower Hood Canal SEPA Checklist Appendix A - Letter Twanoh Map Change.pdf09/01/2009  112 kb
Stage 3 - 04 Lower Hood Canal SEPA Checklist Appendix A - Lake Isabella - Lilliwaup.pdf09/01/2009  533 kb
Stage 3 - 05 Lower Hood Canal SEPA Checklist Appendix B.pdf09/01/2009  69 kb
Stage 3 - Belfair preliminary recommendations.doc09/01/2009  125 kb
Stage 3 - Potlatch-Lake Isabella-Lilliwaup preliminary recommendations.doc09/01/2009  134 kb
Stage 3 - preliminary recommendations Potlatch Lake Isabella Lilliwaup.doc09/01/2009  134 kb
Stage 3 - public comments (Nov 15 workshop).pdf09/01/2009  31 kb
Stage 3 - R-139 Community Based Parks Improvements.pdf09/01/2009  113 kb
Stage 3 - Twanoh preliminary recommendations.doc09/01/2009  77 kb

Stage Four – Preparing final recommendations

At stage four, final adjustments are made to recommendations and submitted to the seven-member Parks and Recreation Commission for approval. The public is encouraged to attend the Commission meeting and provide testimony or to provide written comment.

FileDateSize
Stage 4 - Draft Lower Hood Canal State Park Area Management Plan.pdf09/01/2009  867 kb
Stage 4 - Lower Hood Canal CAMP - Agenda Item.pdf09/01/2009  557 kb

Provide comments

We are very interested in your thoughts and comments about this project. Please provide comments on this project by:

Project lead: Nikki Fields, Puget Sound Parks Planner
E-mail: Belfair.Planning@parks.wa.gov
Phone: (253) 288-3000
Fax: (253) 931-3921
Mail: 2840 Riverwalk Drive SE, Auburn, WA 98002


Miscellaneous documents

Following are downloadable documents related to this project.

FileDateSize
Belfair Estuary final SEPA checklist.pdf09/01/2009  537 kb
Land Classification System.pdf09/01/2009  134 kb
R-139 Community Based Parks Improvements.pdf09/01/2009  113 kb
State Parks Land Classifications.pdf09/01/2009  129 kb