Montage of Washington State Park scenes
spacer

Belfair, Twanoh and Potlatch state parks

map showing Belfair, Twanoh and Potlatch state parks positioned at southern end of Hood Canal

Washington State Parks has begun a land-use planning project for Belfair, Twanoh and Potlatch state parks in the lower Hood Canal area. As planning progresses, check back for updated project information.

The planning project, also known as Classification and Management Planning (CAMP), includes the four planning stages described below. The CAMP will address overall visitor experiences, natural and cultural resources, use of the park’s buildings, recreation areas, and trails, and other topics of interest to the community and park visitors.

The entire planning process includes public workshops and meetings over an approximate year-long period. There are opportunities for the public to comment at each of the stages and documents will be added below when they are available.

Stage One – Identify issues and concerns

The purpose of this stage is to understand what is important to the park community, what to change or save in the state park. This helps get a sense of the range and type of issues that need to be considered through the planning process.

FileDateSize
Stage 1 - Belfair public comments.pdf05/18/2010  23 kb
Stage 1 - Lake Isabella public comments.pdf05/18/2010  32 kb
Stage 1 - Potlatch public comments.pdf05/18/2010  16 kb
Stage 1 - Public comment e-mails.pdf05/18/2010  13 kb
Stage 1 - Twanoh public comments.pdf05/18/2010  16 kb

Stage Two – Exploring alternative approaches

At this stage, the planning team suggests potential alternative approaches to address the various issues and concerns raised by people in stage one. No preferred alternative is established; rather this is an opportunity to understand the range of possibilities.

FileDateSize
Stage 2 - 01 Alternatives Report Belfair.doc05/18/2010  146 kb
Stage 2 - 02 Appendix A Belfair.pdf05/18/2010  277 kb
Stage 2 - 03 Appendix B Belfair.pdf05/18/2010  382 kb
Stage 2 - 04 Alternatives Report Twanoh.doc05/18/2010  215 kb
Stage 2 - 05 Appendix A Twanoh.pdf05/18/2010  256 kb
Stage 2 - 06 Appendix B Twanoh.pdf05/18/2010  241 kb
Stage 2 - 07 Alternatives Report Lk.Isabella.Potlatch.Lilliwap.doc05/18/2010  263 kb
Stage 2 - 08 Appendix A LakeIsabella.pdf05/18/2010  270 kb
Stage 2 - 09 Appendix B LakeIsabella.pdf05/18/2010  266 kb
Stage 2 - 10 Appendix C LakeIsabella.pdf05/18/2010  269 kb
Stage 2 - 11 Appendix A Potlatch.pdf05/18/2010  271 kb
Stage 2 - 12 Appendix B Potlatch.pdf05/18/2010  130 kb
Stage 2 - 13 Appendix A Lilliwap.pdf05/18/2010  124 kb
Stage 2 - public comments (Sept 26 workshop).pdf05/18/2010  31 kb

Stage Three – Preparing preliminary recommendations

The best ideas from the alternative approaches developed in stage two are combined into a preliminary plan in this stage. The plan includes recommendations for use and development of land, changes to property boundaries and ways to address issues raised during the planning process. Another important document completed at this stage is the SEPA checklist that describes environmental impacts of the recommendations (available for public review upon request).

FileDateSize
Stage 3 - 01 Lower Hood Canal DNS.pdf05/18/2010  260 kb
Stage 3 - 02 Lower Hood Canal SEPA Checklist.pdf05/18/2010  362 kb
Stage 3 - 03 Lower Hood Canal SEPA Checklist Appendix A - Belfair-Twanoh-Potlatch.pdf05/18/2010  593 kb
Stage 3 - 03A Lower Hood Canal SEPA Checklist Appendix A - Letter Twanoh Map Change.pdf05/18/2010  112 kb
Stage 3 - 04 Lower Hood Canal SEPA Checklist Appendix A - Lake Isabella - Lilliwaup.pdf05/18/2010  533 kb
Stage 3 - 05 Lower Hood Canal SEPA Checklist Appendix B.pdf05/18/2010  69 kb
Stage 3 - Belfair preliminary recommendations.doc05/18/2010  125 kb
Stage 3 - Potlatch-Lake Isabella-Lilliwaup preliminary recommendations.doc05/18/2010  134 kb
Stage 3 - preliminary recommendations Potlatch Lake Isabella Lilliwaup.doc05/18/2010  134 kb
Stage 3 - public comments (Nov 15 workshop).pdf05/18/2010  31 kb
Stage 3 - R-139 Community Based Parks Improvements.pdf05/18/2010  113 kb
Stage 3 - Twanoh preliminary recommendations.doc05/18/2010  77 kb

Stage Four – Preparing final recommendations

At stage four, final adjustments are made to recommendations and submitted to the seven-member Parks and Recreation Commission for approval. The public is encouraged to attend the Commission meeting and provide testimony or to provide written comment.

FileDateSize
Stage 4 - Draft Lower Hood Canal State Park Area Management Plan.pdf05/18/2010  867 kb
Stage 4 - Lower Hood Canal CAMP - Agenda Item.pdf05/18/2010  557 kb

Provide comments

We are very interested in your thoughts and comments about this project. Please provide comments on this project by:

Project lead: Nikki Fields, Puget Sound Parks Planner
E-mail: Belfair.Planning@parks.wa.gov
Phone: (253) 288-3000
Fax: (253) 931-3921
Mail: 2840 Riverwalk Drive SE, Auburn, WA 98002


Miscellaneous documents

Following are downloadable documents related to this project.

FileDateSize
Belfair Estuary final SEPA checklist.pdf05/18/2010  537 kb
Land Classification System.pdf05/18/2010  134 kb
R-139 Community Based Parks Improvements.pdf05/18/2010  113 kb
State Parks Land Classifications.pdf05/18/2010  129 kb